Import AITURK IDE 1.0.0-beta.1 from Hermes 63279301; preserve MIT license

This commit is contained in:
2026-09-05 13:26:46 +03:00
commit 03634b1ca3
11340 changed files with 3442369 additions and 0 deletions
@@ -0,0 +1,41 @@
# bridge
Gap-crossing structure connecting problem to solution or current to future state.
## Structure
- Left side: current state/problem
- Right side: desired state/solution
- Bridge element spanning the gap
- Gap representing challenge/obstacle
- Bridge elements as steps/methods
## Best For
- Problem to solution journeys
- Current vs future state
- Gap analysis
- Transformation bridges
- Strategic initiatives
## Visual Elements
- Two distinct platforms/sides
- Visible gap or chasm
- Bridge structure with supports
- Icons representing each side
- Stepping stones or bridge planks
## Text Placement
- Title at top
- Left label (From/Problem/Current)
- Right label (To/Solution/Future)
- Bridge elements labeled
- Gap description below
## Recommended Pairings
- `cartoon-hand-drawn`: Friendly journeys
- `corporate-memphis`: Business transformations
- `isometric-3d`: Technical transitions